Company
What Is Actually In the Building
35,000 square feet with clear span height for a 43 foot coach, a downdraft paint booth sized for full body refinish, a frame rack, and separate bays for laminate, interior and systems work so a slow cure job never blocks a fast one.
Why square footage is the whole constraint
A 40 foot Class A with a toad attached needs a yard deep enough to turn, doors tall enough to clear a roof mounted air conditioner and a satellite dome, and clear span inside so it can be worked on from both sides at once.
Every one of those is a building specification rather than a skill, and it is why coach work concentrates in a small number of facilities. A shop in a standard industrial bay cannot take the vehicle, regardless of how good the technicians are.
OCRV Center runs 35,000 square feet, which is what allows 50 to 150 repairs a month to be in progress simultaneously rather than sequentially.
The paint booth is the scheduling bottleneck
A full body refinish on a coach occupies a booth for days, not hours, and a booth cannot be shared while a job is curing. That single fact drives most of the scheduling in the building.
It is also why a paint job quoted at 40 to 250 labor hours can be a 4 to 10 week calendar. The labor is not the constraint. The booth and the cure window are.
Separate bays for slow work
Laminate repair, interior remodel and structural work all run on multi week calendars. Keeping them out of the fast bays is the difference between a two day vent replacement taking two days and taking two weeks because it is parked behind a sidewall rebuild.
What you can see when you visit
Facility tours are available by appointment, and they are worth taking before authorizing a large job. Seeing a coach with its sidewall skin off tells you more about what you are buying than any estimate line does.
An active bay is not a place to wander unaccompanied, so tours are scheduled rather than walk in.
Questions
Questions on this
Can you fit a 43 foot coach indoors?
Yes, including with a slide extended for seal and mechanism work, which is the case that actually constrains most buildings. Height clearance accommodates roof mounted air conditioners and satellite domes without removal.
Do you have your own paint booth?
Yes, a downdraft booth sized for full body refinish on a coach. That matters because the alternative is subcontracting paint, which adds a transport leg and a second schedule to every job that needs finish work.
Is the vehicle stored indoors while it waits on parts?
On the property, and indoors where an opened envelope makes that necessary. A coach with a section of membrane off does not sit outside, because the point of the repair is keeping water out of it.
Can I tour the shop before committing to a large repair?
Yes, by appointment. On a job in the five figure range we would rather you saw the building first. Request a tour and we will schedule around active work.
Tell us what you have and what happened
Read the same business day. We are 18.4 miles from Hacienda Heights, 24 to 38 minutes via SR-60 west to Fullerton Rd, then south to La Palma Ave. Everything goes to info@ocrvcenter.com.
