# What Is Actually In the Building

35,000 square feet with clear span height for a 43 foot coach, a downdraft paint booth sized for full body refinish, a frame rack, and separate bays for laminate, interior and systems work so a slow cure job never blocks a fast one.

## Why square footage is the whole constraint

A 40 foot Class A with a toad attached needs a yard deep enough to turn, doors tall enough to clear a roof mounted air conditioner and a satellite dome, and clear span inside so it can be worked on from both sides at once.

Every one of those is a building specification rather than a skill, and it is why coach work concentrates in a small number of facilities. A shop in a standard industrial bay cannot take the vehicle, regardless of how good the technicians are.

OCRV Center runs 35,000 square feet, which is what allows 50 to 150 repairs a month to be in progress simultaneously rather than sequentially.

## The paint booth is the scheduling bottleneck

A full body refinish on a coach occupies a booth for days, not hours, and a booth cannot be shared while a job is curing. That single fact drives most of the scheduling in the building.

It is also why a paint job quoted at 40 to 250 labor hours can be a 4 to 10 week calendar. The labor is not the constraint. The booth and the cure window are.

## Separate bays for slow work

Laminate repair, interior remodel and structural work all run on multi week calendars. Keeping them out of the fast bays is the difference between a two day vent replacement taking two days and taking two weeks because it is parked behind a sidewall rebuild.

## What you can see when you visit

Facility tours are available by appointment, and they are worth taking before authorizing a large job. Seeing a coach with its sidewall skin off tells you more about what you are buying than any estimate line does.

An active bay is not a place to wander unaccompanied, so tours are scheduled rather than walk in.

## Questions

**Can you fit a 43 foot coach indoors?**

Yes, including with a slide extended for seal and mechanism work, which is the case that actually constrains most buildings. Height clearance accommodates roof mounted air conditioners and satellite domes without removal.

**Do you have your own paint booth?**

Yes, a downdraft booth sized for full body refinish on a coach. That matters because the alternative is subcontracting paint, which adds a transport leg and a second schedule to every job that needs finish work.

**Is the vehicle stored indoors while it waits on parts?**

On the property, and indoors where an opened envelope makes that necessary. A coach with a section of membrane off does not sit outside, because the point of the repair is keeping water out of it.

**Can I tour the shop before committing to a large repair?**

Yes, by appointment. On a job in the five figure range we would rather you saw the building first. Request a tour and we will schedule around active work.


---

Source: https://ocrv.club/the-facility
OCRV Center, 23281 La Palma Ave, Yorba Linda, CA 92887
Phone (949) 799-3387. Email info@ocrvcenter.com.
Serving Hacienda Heights and the surrounding area. 18.4 miles, 24 to 38 minutes via SR-60 west to Fullerton Rd, then south to La Palma Ave.
In shop work only. All estimates are priced and credited against an authorized repair.